Project: Stonehenge Visitor Centre, Wiltshire
Client: Vinci
Value: £2.9m
Woodmace Ltd provided extensive earthworks and groundworks package including works surrounding the Stonehenge monument. Removal and reinstatement of the redundant A344 which used to pass the world heritage site and previous car parks. Due to the location and importance of the site works were continually monitored by English heritage and work methods reflected the archaeological importance of the site.
English Heritage site ground works undertaken within 1.5 miles of the heritage site.